Ranked by effluent quality. The aerated package plant sustains oxygen-loving bacteria and produces the cleanest effluent from the smallest footprint, at the cost of a continuous power draw. A constructed wetland reaches good quality passively but needs real land area. A septic tank settles and digests anaerobically, leaving the drain field to do the final polishing, which is why its site requirements are the strictest.
Solutions
Septic tank + drain field: Standard on-site treatment; anaerobic digestion in the tank, dispersal through the field. The classic design is entirely gravity-fed, no pump, no power, which i
Constructed wetland blackwater treatment: Extends the greywater wetland concept to blackwater with a longer/more robust treatment train. Gravity-fed and genuinely passive where the site gives enough fal
Mains sewer connection: Blackwater and greywater discharged to the public sewer, with all treatment happening off-site at the municipal works. No tank, no drain field, no land take, an