Elevated finished floor level

Passive · New build only

One of 3 ways to meet this need. Cost, carbon, footprint and rankings are relative to other solutions for the same need, not absolute.

What your site needs

Site with a known or projected flood/high-water-table risk

The ground floor built higher than the level floodwater or groundwater is expected to reach. The house sits on a raised base, so water can pass or rise around it without entering the rooms. It keeps floors, walls and belongings dry in a flood.

Build it

Cost
Low
Upkeep
None
Skill to build
Specialist
Lifespan
Matches structure lifespan (a design choice, not a wearing component)
Embodied carbon
Low
Space / material use
Low
When it gives
None
Skill to repair
None
Regulation (FR example)
Part of the structure or footprint: covered by the building permit (permis de construire) for a new dwelling. Rural sites are additionally constrained by the commune's PLU zoning, outside a constructible zone, a new dwelling is generally refused. Source: service-public.gouv.fr

Inputs

none

Outputs

Assess it · 3 ways to meet this need

  • Elevated finished floor level (This page)
    Can I use it? Not in a flat · New build only
    What does it cost me? Upfront cost: Low · Skill to build: Specialist · Upkeep: None · Change to daily life: None · Works without the grid: Yes
    Choose it if you are building new where water can rise, and want rooms that stay dry whatever the level.
  • Diversion swale / intercept ditch
    Can I use it? Not in a flat · No rebuilding needed
    What does it cost me? Upfront cost: Low · Skill to build: Basic · Upkeep: Light · Change to daily life: None · Works without the grid: Yes
    Choose it if you want the runoff from the slope above led around the house by a simple ditch.
  • Deflection berm (splitter wedge)
    Can I use it? Not in a flat · No rebuilding needed
    What does it cost me? Upfront cost: Medium · Skill to build: Intermediate · Upkeep: Light · Change to daily life: None · Works without the grid: Yes
    Choose it if you want a surge of water, mud or debris from uphill split before it reaches the wall.

Sources

Limitations of this page

We don’t list sizing or quantities, as the yield of each technique depends on the quality of its build. The catalogue compares options but doesn’t dimension them. Regulatory notes are indicative, with a French example, and need to be confirmed locally.